/
Find a Dealer
‌

©Kubota Canada Ltd.

©Kubota Canada Ltd.

U27-4

U27-4

U27-4

Mini-Excavators

2 year Warranty

U27-4

Request A Quote

U27-4

Mini-Excavators

2 year Warranty

Request A Quote

Features

Comfort & convenience

Comfort & convenience

A spacious operator station designed for greater comfort, with a fully flat floor for more legroom, digital panel with easy access, simple settings and easy-to-read...

Front meter panel

Front meter panel

For better visibility and accessibility, the meter panel is positioned to the right front corner of the operator station. With easier access, simpler settings,...

AUX diverter valve

AUX diverter valve

The diverter valve allows auxiliary oil to be diverted to operation of auxiliary attachments without the removal of the thumb attachment pipeline for increased efficiency...

Proportional control of AUX circuit

Proportional control of AUX circuit

The thumb- operated switch on the right joystick allows easy proportional flow control of the AUX circuit. And, with the small dial on top...

Tight tail swing

Tight tail swing

The U7-4's tight tail swing proves to be highly versatile when operating in confined conditions. There is less chance for damage to the machine...

Auto shift down

Auto shift down

The U27-4 auto-shift automatically shifts travel speed from high to low, depending on traction and terrain, allowing smoother operation when dozing and turning.

Two-Pattern Selector System (TPSS)

Two-Pattern Selector System (TPSS)

The Two-Pattern Selection System positioned under the seat allows the operator to shift control styles conveniently while seated. A simple turn of a switch is...

Serviceability

Serviceability

Front pin bushings to help maximize durability, centralized swivel bearing lubrication, protected cylinder hoses, steel hood panels, one-sided engine maintenance, and wide hood openings for...

U27-4 Specs

Model name
Model nameU27-4

Downloads

U27-4 Series
Excavator Bucket Lineup
Construction Equipment – Attachments
Kubota Telematics
Orange Plus – CE Planned Maintenance
Operators Manual - U27-4